YX Engineering assessed the existing electrical distribution system at the Best Western Truro – Glengarry, identifying capacity and code-compliance considerations to support the hotel's planned renovations. Our scope included redesigning the electrical circuits serving the hotel restaurant (Miller's Dine & Lounge) and fitness room, with stamped drawings prepared for permit submission. The upgraded systems meet current CEC requirements — delivered with minimal disruption to
ongoing hotel operations.